Ningde City has implemented various types of emission reduction projects 32

Recently, this reporter learned from the Municipal Environmental Protection Bureau, Ningde City “Eleventh Five-Year” special plan for environmental protection has entered the intermediate stage. So far, a total of implementing the sewage treatment plant COD emission reduction projects 4, industrial COD treatment of 11 emission reduction projects, non-electric (thermal power industries except) SO2 emission reduction projects of governance 18, COD shut down polluting factories or production lines 42 , SO2 shut down polluting factories or production lines to 16.

The plan to address the constraints Ningde endanger people’s physical and mental health for economic development and environmental issues as key areas to carry out environmental protection special action, strengthen pollution control and the comprehensive improvement of urban environment and promote eco-city construction. Municipal Environmental Protection Bureau related to the staff, through the efforts of two and a half, and environmental protection plan developed by the smooth implementation of the main tasks and achieved good results. First half of 2008 the city’s drinking water source to water quality compliance rate was 100%; within the major river basins: Cross River, huotong River, Gutian River, Minjiang Gutian paragraph, crossing water features dual-port Aojiang compliance rate was 100%; urban air quality two standard ratio of the number of days accounted for 100%, respectively. The ecological environment, the designated basic farmland land 30795, protecting an area of 1,349,220.16 hectares. Has built 33 nature reserves, covering an area of 134.42 thousand hectares. The establishment of Ecological Demonstration Area 21, and built two state-level geological parks, covering an area of 45,864 hectares. City’s forest coverage reached 65.7%, urban built-up area green coverage rate reached 37.2%.

Ningde City “Eleventh Five-Year” special plan to achieve effective environmental protection at the same time, there still exists some problems, such as: urban environmental infrastructure construction, the time lag; major pollutants COD, sulfur dioxide emissions from the status quo with the planning goal and still have a certain gap; some places emphasis on economic growth, environmental protection, light is not a fundamental change in thinking.

宁德市已落实了减排项目32个不同类型的

近日,记者从市环保局获悉,宁德市“十一五”环境保护专项规划已进入中期阶段。到目前为止,实施污水处理厂化学需氧量减排项目4个,11个减排项目,非电(火电行业除外)的二氧化硫排放治理的18个工业化学需氧量减排项目共治疗,化学需氧量关闭污染工厂或生产线42,二氧化硫关闭污染的工厂或生产线16。

该计划,以解决制约宁德危害人民的身体和智力促进经济发展和环境问题的关键领域进行健康环保专项行动,加强污染控制和城市环境,促进生态城市建设的全面改善。市环保局有关工作人员,通过两年半的努力,环保计划的主要任务,发展的顺利实施,取得了良好的效果。首先,2008年上半年全市饮用水源水质达标率为100%,在主要江河流域:十字河,霍童河,古田溪,闽江古田段,穿越水功能的双端口敖江合格率为100%;城市空气质量的两个标准的天数比例占100%,分别为。生态环境,指定基本农田土地30795,保护了1,349,220.16公顷。已建立33个自然保护区,面积一三四四二○公顷领域。生态示范区21分,建立了两个国家级地质公园,占地45864公顷区的设立。全市森林覆盖率达65.7%,高于区绿化覆盖率达市区已达到37.2%。

宁德市“十一五”专项规划,以实现在同一时间有效的保护环境,还存在一些问题,如:城市环境基础设施建设,时间滞后,主要污染物化学需氧量,二氧化硫的排放现状与规划的目标,而且还有一定的差距,一些地方对经济增长的重点,环保,轻工并不是一个思想的根本转变。08.10.17

Tags: , , ,