Anhui Meteorological Department in order to enhance scientific research capacity to tackle climate change
In 2008, the Anhui Provincial Government approved the establishment of agreed to adjust the energy saving and emission reduction work leading group on climate change, the provincial meteorological bureau, as leading members of the group units gradually assume a more important role. At present, the Provincial Meteorological Bureau and the Provincial Development and Reform Commission, establishment of the department at the provincial level to address climate change programs.
response to climate change is one of the main meteorological departments, the provincial meteorological bureau closely deployed around the China Meteorological Administration and local development needs, launched a rainstorm and flood risk zoning study of the feasibility of major projects in climate research, participation in the provincial building energy efficiency standards development work, in order to Anhui Province to address climate change mitigation and energy to provide scientific and technological lead, so that the green landscape mapping in Anhui.
complete the rainstorm and flood risk zoning study
2008 year, Anhui Meteorological Bureau launched the China Meteorological Administration forecast on the weather Disaster Risk and Disaster Mitigation Division pilot construction tasks. The project from the disaster-causing factors, geo-hazards, disaster bearing body, resilience four aspects of a comprehensive assessment of the risk of flooding in Anhui, and create the risk of rainstorm and flood zoning map of the province. Flood disaster of historical data and the typical big flood year flood zone as well as related historical documents and records of the zoning map to verify results show that the division results and basically in line with the actual situation.
for the completion of project construction, Anhui Bureau of carrying out a great deal of painstaking work: compiling the history of Anhui rainstorm, flood disaster, basic geographic information, socio-economic statistics, etc. established flood disaster risk databases.
major projects carried out a feasibility study of climate
Anhui Meteorological Bureau for a number of major projects carried out a feasibility study of climate and ultimately the formation of research results into provincial government and the project construction units refer to the important one of the bases.
in Hefei Xinqiao International Airport pre-preparation process, the Meteorological Department in Anhui Province in December 2006 at the proposed site area set up a special automatic weather stations throughout the region, temperature, pressure, humidity, wind direction , wind speed, precipitation and other meteorological elements observed to get a whole year on-site meteorological data at the same time through the extreme inspection, internal consistency and temporal consistency in a variety of methods Shimbashi station meteorological data for quality inspection and control. In order to more realistically reflect the new address weather conditions, the council bridge the airport, 90 km in all directions within the eight stations choose the data were compared with this analysis, the final formation of Hefei Xinqiao Airport Wind Analysis Report.
Wuhu nuclear power plant site for mastering the elements of weather conditions and its variation, analytical engineering meteorological characteristics, commissioned by the China Guangdong Nuclear Power Group, Anhui Meteorological Bureau to determine the meteorological station sites dedicated stations - Fanchang County penholder Village, national meteorological observation stations in accordance with the standards of construction of two stations, on March 6, 2007 for completion. Until March 10, 2008, the nuclear power plant dedicated meteorological station completed a year of observation missions, resulting in the original site observation and analysis of representative data, including solar radiation, wet bulb temperature, evaporation, etc. 14 large-scale meteorological elements, for the hydraulic, hydrological and environmental protection, accumulation of basic information professional. Anhui Wuhu nuclear power plant at the same time the Council has completed an engineering feasibility study, “Meteorological Observations dedicated stations Jianzhan topic” research work, according to observations submitted by observing the outcome of the final report of the feasibility report for the provision of meteorological basis for nuclear power plants.
安徽省气象局,以加强科研能力,以应对气候变化
2008年,安徽省政府批准成立的同意调整节能减排气候变化工作领导小组,省气象局,作为领导小组成员单位,逐步承担起更加重要的作用。目前,省气象局和省发展和改革委员会,成立省级部门应对气候变化的计划。
应对气候变化是主要的气象部门之一,省气象局紧紧围绕中国部署了中国气象局和地方发展的需要,推出了暴雨和洪水风险在气候研究,参与重大项目的可行性研究分区省建筑节能标准的开发工作,以解决安徽省减缓气候变化和能源提供科学和技术上的领先地位,使安徽的绿色景观映射。
完整的暴雨和洪水风险区划研究
2008年,安徽省气象局启动了中国气象灾害的天气风险和灾害,政府预测减灾司试点工程建设任务。从灾难项目致癌因素,地质灾害,承灾体,弹性四个一对安徽水灾风险综合评估方面,创造了暴雨和洪水省区划图的风险。洪水的历史数据和典型的大洪水年洪水灾害的地区,以及相关的历史文献及区划图记录,以核实结果表明,分裂结果,并符合基本符合实际情况。
用于项目建设,安徽省开展了大量细致的工作局完成:编制安徽省暴雨,洪涝灾害,基础地理信息,社会经济统计资料,建立洪水等灾害风险数据库的历史。
重大项目进行了可行性研究气候
了多项大型工程安徽省气象局开展了气候可行性研究,并最终成为省政府和项目建设单位的研究成果形成的指的重要基地之一。
在合肥新桥国际机场预先准备的过程中,2006年12月在安徽省气象部门在网站上提出一个特殊的整个区域,温度,压力,湿度,风向,风速自动气象站设置区,降水和其他气象要素的观测,以获得全年现场,要通过极端的检查,内部一致性和不同的方法时间一致性同时新桥站气象数据质量检查和控制气象数据。为了更真实地反映新的地址的天气条件下,该局桥机场,90公里范围内所有方向的8个车站选择的数据进行比较分析时,合肥新桥机场风分析报告的最后形成。
芜湖核电为掌握天气状况及其变化,分析工程气象特性由中国广东核电集团,安徽省气象局委托的内容,以确定气象专用站站址-繁昌县笔架村厂区,根据国家气象观测站的两站的建设标准,2007年3月6日,完成。直到08年3月10日,该核电厂专用气象站完成了一年的观察团,在原来的实地观察和代表性的数据,包括太阳辐射,湿球温度,蒸发等14个大型气象要素的分析结果用于液压,水文和环保等基础资料的积累,专业。安徽芜湖与此同时,安理会已完成了工程可行性研究核电厂,“气象观测站Jianzhan专用主题”的研究工作,根据观察了提供的可行性研究报告结果的最后报告提出的意见气象基础核电厂。08.12.29
Tags: anhui, climate, meteorological, provincial□ 七个部门将共同进行坚决遏制滥用添加剂的宣传质量
□ China is considering a substantial increase in installed nuclear power capacity
□ Lanzhou Airport construction of circular economy industrial base shape
□ Weinan invest 850 million yuan to complete 10 events