Shandong Dezhou-round upgrading of urban sewage treatment plant

To achieve the “Shandong Haihe River Basin water pollutant discharge standards” requirements of a B standard, a few days ago, reporters from Dezhou City, Shandong Province, the second focused on environmental protection in the New Century informed of the activities of the city according to the original two standard designs have been completed and urban sewage treatment plant being upgraded to meet the emission standards. Sewage treatment plant under construction and all of a B in accordance with standard construction.

According to reports, in May 2007 for the early resumption of the Haihe River Basin, Shandong Province, the main ecological functions of rivers to ensure safe water environment, combined with the practical, Shandong, Shandong Provincial Environmental Protection Bureau and the Provincial Bureau of Quality Supervision jointly issued the “Haihe River Basin, Shandong Province, water pollution discharge standard “(hereinafter referred to as the” standard “), and in that year come into effect on July 1. “Standard” is divided into three periods, respectively, from July 1, 2007, the July 1, 2008 starting July 1, 2009 implementation date, and gradually tightened. CODcr and the third time a standard concentration of ammonia nitrogen emissions from the implementation of 60mg / L and 10mg / L standard, secondary standard CODcr and the concentration of ammonia nitrogen emissions from the implementation of 100mg / L and 15mg / L standard.

It is reported that the standard for enterprise vertical standards, urban sewage treatment plants more stringent emission standards. To achieve this standard, Dezhou 2 emission standards according to the design of the sewage treatment plant has been unable to meet the requirements. Therefore, the joint Runtong Texas Water Co., Texas Economic Development Zone, sewage canals to change row works, Ling County sewage treatment plant, Linyi County sewage treatment plant, sewage treatment plant Leling upgrade work had been carried out, including temporary eup County sewage treatment plant transformation has been completed. Construction and trial operation Tianqu Industrial Park sewage treatment plants, sewage treatment plant in Texas Economic Development Zone, Ning County sewage treatment plant, Qingyun Xian sewage treatment plants, sewage treatment plants Linpan, Xiajin County sewage treatment plant, Wu County sewage treatment plant will also comply with a B standard construction or test run.

山东德州的全面城市污水处理厂改善工程

要实现“山东海河流域水污染物排放标准的B标准,在数天前”的要求,从德州市,山东省第二次新世纪环保重点记者通报了这个城市的活动,按照原来两个标准设计已经完成,城市污水处理厂正在升级,以达到排放标准。正在建设污水处理厂和1,根据乙所有标准建设。

据报道,2007年5月对海河流域,山东省主要河流的生态功能早日恢复,以确保安全的水环境,结合实际,山东,山东省环境保护局和省局国家质量监督联合下发了“海河流域,山东省水污染物排放标准”(以下简称“标准”),并在这一年生效7月1日。 “标准”分为三个时期,分别从2007年7月1日,分歧,2008年7月1日起2009年7月1日实施日期,并逐步收紧。 CODcr和第三次的氨氮排放执行的标准浓度60毫克/ L和10mg / L的标准,二级标准CODcr和氨氮的排放量从100毫克执行浓度/ L和15毫克/ L的标准。

据报道,为企业的标准垂直标准,城市污水处理厂更严格的排放标准。为了达到这个标准,德州2的排放标准,根据污水处理厂设计已经不能满足要求。因此,德州联合润通水务有限公司,德州经济开发区污水排改变运河工程,陵县污水处理厂,临邑县污水处理厂,乐陵市污水处理厂升级工作已经开展,包括临时邑县污水处理厂改造已经完成。建设和试运行天衢工业园污水处理厂,污水在得克萨斯州经济开发区,安宁县污水处理厂,青云西安污水处理厂,污水处理厂临盘,夏津县污水处理厂,吴县污水处理厂处理厂也将遵守B标准建设或试运行。08.10.27

Tags: , , ,